Our Projects

Explore our portfolio of construction projects across multiple markets and regions.
Filters
MArket
Tags
Houston, TX

Hermann TDS East Belt Industrial Build-to-Suit

Rycon was the design-builder for a warehouse featuring tilt-up concrete panels, steel framing, 36’ clear height, high-density storage, 40 loading docks, and a 22,000 sf high-end office. HVAC and site systems support operations. Site work included stormwater management and landscaping.
Design-Build
Tilt-Up
High-Capacity Systems
Hialeah, FL

Countyline Corporate Park 18 KeHE

This LEED Certified, build-to-suit cold storage facility includes 87,000 sf of cooler/freezer space, offices, and cross-docking. Delivered via design-assist, it features tilt-up concrete and steel construction, gas management under slab, 36’ clear height, ESFR fire protection, and full site prep.
Design-Assist
Cold Storage
Tilt-Up
Miami, FL

Floor & Decor Miami

Located within Kendall Village Center, Rycon provided precon and CM services for this new store. The scope of work included rooftop parking and utilized the tilt-up construction method. Rycon has provided construction services for Berkowitz Development since 2017.
Ground-Up
Tilt-Up
Repeat Client
Nationwide,

U-Haul Moving & Storage New Builds & Renovations

These multi-story, 100,000 sf (avg) climate-controlled storage facilities were built using tilt-wall, CIP concrete, or cold-formed metal with slab-on-deck. Most included separate PEMB U-box warehouses. Scope covered site work, MEP systems, finishes, elevators, and lockers.
Ground-Up
PEMB U-Box
Renovations
Medley, FL

HRP Group Warehouse

This tilt-up warehouse includes 30,000 sf of 28°F cold storage with insulated slab and 30’ IMP ceilings and walls, 32,000 sf of 34°F coolers, restrooms, offices, break room, locker room, production lines, ventilation, and dry storage. The scope included extensive site work.
Tilt-Up
Cold Storage
Site Work
Orange Park, FL

U-Haul Moving & Storage of Orange Park

Rycon was the design-builder on this new 880-locker three-story climate-controlled facility featuring a concrete tilt-up first floor with steel and cold-formed framing, plus a separate PEMB U-Box. Work included site improvements, elevators, masonry, EIFS/stucco, finishes, and MEP systems.
Design-Build
Tilt-Up
PEMB U-Box
Hialeah, FL

Countyline Corporate Park

Rycon built Class A single-level tilt-up warehouses with 27’ panels and future knockouts. These LEED Certified spec buildings feature an under-slab gas management system, 36’ ceilings, ESFR sprinklers, fire pump. The scope included full site and utility prep.
Ground-Up
Tilt-Up
LEED Certified
Lake Wylie, SC

U-Haul Moving & Storage of Lake Wylie

This new three-story storage facility features 741 lockers and a first-floor concrete tilt-wall structure with steel framing. The climate-controlled building includes full MEP systems and finishes. Site work involved grading, utilities, underground detention, landscaping, fencing, and lot.
Tilt-Up
Climate-Controlled
Site Work
Hialeah, FL

Beacon Logistics Park

These spec tilt-wall warehouses include a gas management system and 27’ wide panels, 6” to 9¼” thick. Building E was fit out for a food company with cold storage, offices, and a refrigerated dock. A new park entrance with landscaping, signage, and a 40’ curved wall was also completed.
Tilt-Up
Cold Storage
Site Work
Years in the Industry

Projects