Beacon Logistics Park

Project Scope

Tilt-Up
These new spec tilt-wall industrial warehouses have a gas management system incorporated in their building pad. In most cases the tilt-up panels consist of 27’ wide and a thickness ranging from 6” (ramp panels) to 9¼” (wall panels) for the single-level concrete and steel warehouses.
Cold Storage
Building E was built out for a food corporation with a 40,500 sf freezer, 12,200 sf cooler, dual refrigeration systems, offices with trucker amenities, and a refrigerated dock with 11 insulated doors. The cold areas feature 30’ ceilings.
Site Work
A new park entrance consisting of all landscaping, monumental sign, 40’ concrete curved wall, and electrical was completed.

Project Gallery

Project Details

Owner Codina Partners
Architect Arcadis
Location Hialeah, FL
Years in the Industry

Beacon Logistics Park